Historical information based iterated greedy algorithm for distributed flowshop group scheduling problem with sequence-dependent setup times
Xuan He, Quan-Ke Pan, Liang Gao, Janis S. Neufeld, Jatinder N.D. Gupta
Topics & Concepts
Iterated functionJob shop schedulingMathematical optimizationScheduling (production processes)Sequence (biology)Operator (biology)Flow shop schedulingGreedy algorithmAlgorithmComputer scienceMathematicsConstructiveProcess (computing)GeneChemistryGeneticsScheduleBiochemistryMathematical analysisTranscription factorRepressorBiologyOperating systemScheduling and Optimization AlgorithmsAdvanced Manufacturing and Logistics OptimizationAssembly Line Balancing Optimization