Production scheduling in modular construction: Metaheuristics and future directions

Achini Peiris, Felix Kin Peng Hui, Colin Duffield, Tuan Ngo

2023Automation in Construction47 citationsDOIOpen Access PDF

Abstract

Modular construction (MC) is an increasingly important construction technique. However, it also requires the use of sophisticated scheduling algorithms. A comprehensive literature review of different scheduling systems used for prefabricated construction, was conducted using the PRISMA methodology. Over 500 relevant papers were analysed and 59 critical applications of production scheduling metaheuristics were closely examined. However, very few of these were for modular construction. This paper provides a deep analysis of GA applications in scheduling and the newer techniques using PSO, SA and ACO. The results of the review suggest 6 directions for future research namely, (i) Consideration of added complexities, (ii) Responsiveness of the scheduling system to new tenders or work, (iii) Integrating production scheduling with Manufacturing Execution and Control Systems, (iv) Dynamic scheduling, (v) Simulation-based optimization techniques for MC, (vi) Use of AI and machine learning concepts for MC. This paper will inform better production scheduling of MC projects.

Topics & Concepts

Scheduling (production processes)Modular designComputer scienceMetaheuristicDynamic priority schedulingTwo-level schedulingFair-share schedulingIndustrial engineeringDistributed computingEngineeringArtificial intelligenceOperations managementOperating systemScheduleBIM and Construction IntegrationManufacturing Process and OptimizationResource-Constrained Project Scheduling
Production scheduling in modular construction: Metaheuristics and future directions | Litcius