Litcius/Paper detail

Versatile Link+ Transceiver Production Readiness

Lauri Olanterä, Jeremy Blanc, S. Détraz, Anton Fetzer, Andrea Kraxner, Carmelo Scarcella, Christophe Sigaud, Csaba Soós, J. Troska, F. Vasey, Ping Gui, Liang Fang, A. Prosser, A. R. Weidberg

202014 citationsDOIOpen Access PDF

Abstract

The Versatile Link + project is about to enter its production phase, ready for the Phase 2 HL-LHC detector upgrades. We present the status of the front-end part of the Versatile Link + project: the Versatile Link + Transceiver, which provides a low-mass, radiation tolerant, optical transmit- and receive module for tight integration in the upgrading HL-LHC detectors. We describe the development and thorough testing carried out with the transceiver prototypes and their sub-components and the design decisions that have led to the final production-ready prototype. The planned production schedule is also presented.

Topics & Concepts

TransceiverComputer scienceScheduleLarge Hadron ColliderDetectorProduction (economics)Link (geometry)Optical linkEmbedded systemSystems engineeringComputer hardwareTelecommunicationsComputer networkEngineeringOperating systemPhysicsParticle physicsWirelessMacroeconomicsEconomicsOptical fiberParticle Detector Development and PerformanceDistributed and Parallel Computing SystemsParticle physics theoretical and experimental studies
Versatile Link+ Transceiver Production Readiness | Litcius