Litcius/Paper detail

Numerical analysis and application of the construction method for the small interval tunnel in the turn line of metro

Zhanping Song, Xiaoxu Tian, Qi Liu, Yuwei Zhang, Heng Li, Guannan Zhou

2020Science Progress23 citationsDOIOpen Access PDF

Abstract

A section of the Santunbei turn line of Urumqi Metro Line 1# was taken as the engineering background. The proposed construction method was analyzed by numerical simulation. Numerical analysis shows that the final surface settlement caused by the proposed construction method is 3.0 mm and the horizontal convergence is 3.2 mm. It also turns out that the proposed construction method causes less deformation, and the method can be applied to the construction of the small interval tunnel in the Santunbei turn line of metro. The rationality of the method and numerical model was further verified by comparison between the monitored data of surface settlement, horizontal convergence and vault sinking, and numerical simulation results. Finally, the deformation and stress of the six construction methods were compared. The deformation and stress caused by the six construction methods are almost the same. It indicates that the construction spacing between the left and right tunnels does not affect the safety of tunnel construction. Therefore, the appropriate construction spacing could be selected according to the resource configuration, instead of deformation and stress.

Topics & Concepts

Deformation (meteorology)Computer simulationSettlement (finance)Numerical analysisStructural engineeringTunnel constructionLine (geometry)ExcavationInterval (graph theory)EngineeringStress (linguistics)Geotechnical engineeringGeologyComputer scienceMathematicsGeometrySimulationLinguisticsOceanographyWorld Wide WebPhilosophyPaymentCombinatoricsMathematical analysisGeotechnical Engineering and AnalysisCivil and Geotechnical Engineering ResearchGeotechnical Engineering and Underground Structures