AI data-center (DC) growth is increasingly constrained by limited deliverable electricity, interconnection capacity, and cooling demand. This study develops a boundary-consistent screening framework for waste-to-energy (WtE)-coupled AI DC cooling, treating cooling as an energy service that can be supplied through grade matching rather than solely through electricity-driven mechanical chilling. The framework translates plant-side exportable heat into corridor-level planning objects by explicitly accounting for thermal attenuation, absorption-based conversion, and parasitic electricity associated with delivery and auxiliaries. Three results structure the analysis. First, a reference-case energy-service ledger shows how a representative regulated WtE plant with municipal solid-waste throughput of 1500 t/day and lower heating value of 10 MJ/kg yields ~78.1 MWth of exportable driving heat and, at a 20 km corridor, ~53.0 MWcool of delivered cooling and ~8.0 MWe of net avoided cooling electricity after parasitic debiting. Second, the coupled system is governed by operating regimes, not a single efficiency score. Under the baseline package, full thermal coverage is maintained up to ~20.9 km, the stricter quality-adjusted criterion remains positive to ~22.9 km, and the electricity–relief criterion remains positive to ~44.7 km. Third, deployment-scale translation for a 1 GW IT campus (u=0.70, L=5 km) implies a net grid relief of ~116.9–264.4 MW across scenario packages, while the required WtE footprint ranges from roughly three to 148 equivalent representative plants, or about 0.6–40 full-load-equivalent plants at a 25% displacement target. The contribution is a siting-ready planning framework that identifies when WtE-coupled cooling remains corridor-feasible, when it becomes hybrid and marginal, and when infrastructure scale rather than thermodynamic benefit becomes the binding constraint. It is intended as a screening tool for planning and comparison, not as a project-specific hydraulic or plant-cycle design.

Topics & Concepts

ElectricityEngineeringFootprintPassive coolingScale (ratio)Baseline (sea)GridWater coolingEfficient energy useService (business)ThroughputNet present valueTime horizonActive coolingMatching (statistics)Electricity generationAir coolingEnvironmental scienceCooling capacityInterconnectionAir conditioningAutomotive engineeringFull scaleRenewable energySimulationComputer scienceEnergy (signal processing)Production (economics)Operations managementCooling loadEnergy planningIntegrated Energy Systems OptimizationThermodynamic and Exergetic Analyses of Power and Cooling SystemsProcess Optimization and Integration
Planning Waste-to-Energy-Coupled AI Data Centers Through Grade-Matched Cooling and Corridor Screening | Litcius