Litcius/Paper detail

A benchmark comparison of Gaussian process regression, support vector machines, and ANFIS for man-hour prediction in power transformers manufacturing

Kamil Işık, S. Emre Alptekin

2022Procedia Computer Science10 citationsDOIOpen Access PDF

Abstract

Production times affect the product valuations because they are directly relevant to a product's cost. The man-hour unit is widely used for measuring the production times, especially in labor-intensive manufacturing environments, and it is considered when making product valuations before the tendering phase of power transformer projects. To our knowledge, no study has been made to improve the prediction performance of man-hour estimations in this field. In this study, SVM, GPR, and ANFIS models were simultaneously applied to predict man-hours in Power Transformer manufacturing.

Topics & Concepts

Computer scienceSupport vector machineTransformerProcurementMachine learningReliability engineeringIndustrial engineeringManufacturing engineeringArtificial intelligenceElectrical engineeringEngineeringVoltageBusinessMarketingIndustrial Vision Systems and Defect DetectionCurrency Recognition and DetectionFault Detection and Control Systems