Litcius/Paper detail

Heuristics to optimize total completion time subject to makespan in no-wait flow shops with sequence-dependent setup times

Fernando Siqueira de Almeida, Marcelo Seido Nagano

2022Journal of the Operational Research Society16 citationsDOI

Abstract

We propose four algorithms for the no-wait flow shop scheduling problem. The objective is minimizing total completion time such that makespan is not greater than a maximum value. We address the problem with sequence-dependent setup times, an important production constraint that has never been considered for this problem before. The proposed algorithms start from an initial solution and then iterate through a process that destroys and repairs the incumbent solution in order to improve it. The methods are build combining distinct destruction and construction mechanisms, where the search intensification-diversification is explored at different levels. After an initial assessment, the best proposed algorithm (IG4) is chosen to be compared with three literature methods (PAL, TOB, ISA-2) developed for similar problems. Computational experiments revealed that the overall average relative percentage deviation of PAL, TOB, ISA-2, and IG4 are 10.97%, 4.44%, 2.07%, and 0.36%, respectively. The statistical analysis confirms that IG4 significantly outperforms the existing methods.

Topics & Concepts

Job shop schedulingHeuristicsFlow shop schedulingMathematical optimizationComputer scienceScheduling (production processes)Project managementSequence (biology)Diversification (marketing strategy)Time constraintOperations researchMathematicsScheduleEngineeringMarketingGeneticsLawBiologyOperating systemPolitical scienceSystems engineeringBusinessScheduling and Optimization AlgorithmsAdvanced Manufacturing and Logistics OptimizationOptimization and Packing Problems
Heuristics to optimize total completion time subject to makespan in no-wait flow shops with sequence-dependent setup times | Litcius