Litcius/Paper detail

BIM-based constructability-aware precast building optimization using optimality criteria and combined non-dominated sorting genetic II and great deluge algorithm (NSGA-II-GD)

Weng-Lam Lao, Mingkai Li, Billy C.L. Wong, Vincent J.L. Gan, Jack C.P. Cheng

2023Automation in Construction26 citationsDOI

Topics & Concepts

Precast concreteConstructabilitySortingStandardizationGenetic algorithmComponent (thermodynamics)Computer scienceRebarConvergence (economics)Mathematical optimizationAlgorithmEngineeringStructural engineeringMathematicsMachine learningThermodynamicsEconomicsOperating systemPhysicsEconomic growthBIM and Construction IntegrationInfrastructure Maintenance and Monitoring3D Surveying and Cultural Heritage