Litcius/Paper detail

Single Machine Scheduling Proportionally Deteriorating Jobs with Ready Times Subject to the Total Weighted Completion Time Minimization

Zheng-Guo Lv, Li-Han Zhang, Xiaoyuan Wang, Ji‐Bo Wang

2024Mathematics33 citationsDOIOpen Access PDF

Abstract

In this paper, we investigate a single machine scheduling problem with a proportional job deterioration. Under release times (dates) of jobs, the objective is to minimize the total weighted completion time. For the general condition, some dominance properties, a lower bound and an upper bound are given, then a branch-and-bound algorithm is proposed. In addition, some meta-heuristic algorithms (including the tabu search (TS), simulated annealing (SA) and heuristic (NEH) algorithms) are proposed. Finally, experimental results are provided to compare the branch-and-bound algorithm and another three algorithms, which indicate that the branch-and-bound algorithm can solve instances of 40 jobs within a reasonable time and that the NEH and SA are more accurate than the TS.

Topics & Concepts

Upper and lower boundsTabu searchSingle-machine schedulingMinificationMathematical optimizationSimulated annealingBranch and boundScheduling (production processes)Computer scienceJob shop schedulingAlgorithmMathematicsScheduleMathematical analysisOperating systemScheduling and Optimization AlgorithmsOptimization and Search ProblemsAdvanced Manufacturing and Logistics Optimization
Single Machine Scheduling Proportionally Deteriorating Jobs with Ready Times Subject to the Total Weighted Completion Time Minimization | Litcius