An efficient multi-objective adaptive large neighborhood search algorithm for solving a disassembly line balancing model considering idle rate, smoothness, labor cost, and energy consumption
Amir M. Fathollahi‐Fard, Peng Wu, Guangdong Tian, Dexin Yu, Tongzhu Zhang, Jianwei Yang, Kuan Yew Wong
Topics & Concepts
Computer scienceHeuristicsMathematical optimizationIdleProcess (computing)RemanufacturingProduct (mathematics)Energy consumptionWorkstationSmoothnessAlgorithmIndustrial engineeringManufacturing engineeringMathematicsEngineeringMathematical analysisOperating systemGeometryElectrical engineeringManufacturing Process and OptimizationBIM and Construction IntegrationScheduling and Optimization Algorithms