Litcius/Paper detail

A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts

Amir Faraji, Shima Homayoon Arya, Elnaz Ghasemi, Maria Rashidi, Srinath Perera, Vivian W.Y. Tam, Payam Rahnamayiezekavat

2023Construction Innovation18 citationsDOI

Abstract

Purpose In the construction industry, various parties are involved in a project. Consequently, claims and disputes are inevitable in this industry. This paper aims to develop Integrated project delivery (IPD) practices including early involvement of stakeholders and multiparty contracts which its combination with advanced technologies such as blockchain can lead to better dispute management and improve the whole construction process. Design/methodology/approach Based on literature review, the alternative dispute resolution (ADR) for IPD contacts were identified, and three formats of IPD contracts were selected, and the dispute resolution process of them has been analyzed. Then, based on blockchain review, a conceptual blockchain-based dispute management (BDM) model was generated for ADR in IPD. Model validation was done by an interview. Experts were asked to compare the BDM model with the traditional system regarding the ADR duration. Findings Analyses of the collected data from the experts demonstrated that the BDM model has better function in terms of time and cost for ADR process when the project is facing serious and considerable number of disputes. The relation between blockchain technology (BCT) and building information modeling (BIM) has been examined through a framework, and the ability of the proposed model for administrating dispute resolution process has been verified using four different scenarios of construction claims that show the system can run successfully. Originality The current study proposes a truthful model, reliable framework to address the problem of project dispute management in IPD contracts. The system combines the ability to being unchangeable and the reliability characteristics of BCT with informative and automation aspects of BIM together to improve dispute resolution issue in the IPD system.

Topics & Concepts

Integrated project deliveryBlockchainDispute resolutionProcess (computing)Process managementComputer scienceConceptual modelProject managementBuilding information modelingKnowledge managementConceptual frameworkRelation (database)Risk analysis (engineering)Computer securityBusinessOperations managementSystems engineeringEngineeringLawData miningPolitical scienceScheduling (production processes)PhilosophyOperating systemEpistemologyDatabaseBIM and Construction IntegrationConstruction Project Management and PerformanceOccupational Health and Safety Research
A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts | Litcius