Litcius/Paper detail

Avoiding slush for hot-point drilling of glacier boreholes

Benjamin Hills, Dale P. Winebrenner, W. T. Elam, P. M. Kintner

2020Annals of Glaciology14 citationsDOIOpen Access PDF

Abstract

Abstract Water-filled boreholes in cold ice refreeze in hours to days, and prior attempts to keep them open with antifreeze resulted in a plug of slush effectively freezing the hole even faster. Thus, antifreeze as a method to stabilize hot-water boreholes has largely been abandoned. In the hot-point drilling case, no external water is added to the hole during drilling, so earlier antifreeze injection is possible while the drill continues melting downward. Here, we use a cylindrical Stefan model to explore slush formation within the parameter space representative of hot-point drilling. We find that earlier injection timing creates an opportunity to avoid slush entirely by injecting sufficient antifreeze to dissolve the hole past the drilled radius. As in the case of hot-water drilling, the alternative is to force mixing in the hole after antifreeze injection to ensure that ice refreezes onto the borehole wall instead of within the solution as slush.

Topics & Concepts

SlushBoreholeGeologyDrillingAntifreezeFreezing pointDrilling fluidPetroleum engineeringIce divideGeotechnical engineeringThermodynamicsIce streamMechanical engineeringEngineeringPhysicsOceanographySea iceCryosphereCryospheric studies and observationsWinter Sports Injuries and PerformanceArctic and Antarctic ice dynamics
Avoiding slush for hot-point drilling of glacier boreholes | Litcius