Litcius/Paper detail

Process scheduling for prefabricated construction based on multi-objective optimization algorithm

Yan Li, Jiajun Wu, Yi Hao, Yuchen Gao, Runqi Chai, Senchun Chai, Baihai Zhang, Baihai Zhang

2024Automation in Construction16 citationsDOI

Topics & Concepts

Scheduling (production processes)Computer scienceProcess (computing)PrefabricationMathematical optimizationAlgorithmConstruction managementOptimization algorithmEngineeringIndustrial engineeringEngineering drawingStructural engineeringMathematicsCivil engineeringProgramming languageBIM and Construction IntegrationManufacturing Process and OptimizationResource-Constrained Project Scheduling
Process scheduling for prefabricated construction based on multi-objective optimization algorithm | Litcius