Litcius/Paper detail

An effective multi-start iterated greedy algorithm to minimize makespan for the distributed permutation flowshop scheduling problem with preventive maintenance

Jiayang Mao, Quan-Ke Pan, Zhonghua Miao, Liang Gao

2020Expert Systems with Applications126 citationsDOI

Topics & Concepts

Job shop schedulingInitializationComputer scienceMathematical optimizationScheduling (production processes)Greedy algorithmPreventive maintenanceIterated local searchIterated functionLocal optimumLocal search (optimization)AlgorithmMathematicsScheduleReliability engineeringOperating systemEngineeringProgramming languageMathematical analysisScheduling and Optimization AlgorithmsAdvanced Manufacturing and Logistics OptimizationAssembly Line Balancing Optimization