Litcius/Paper detail

Identifying the Major Construction Wastes in the Building Construction Phase Based on Life Cycle Assessments

Won-Jun Park, Rakhyun Kim, Seungjun Roh, Hoki Ban

2020Sustainability33 citationsDOIOpen Access PDF

Abstract

The purpose of this study was to identify the major wastes generated during the construction phase using a life cycle assessment. To accomplish this, the amount of waste generated in the construction phase was deduced using the loss rate and weight conversions. Major construction wastes were assessed using six comprehensive environmental impact categories, including global warming potential, abiotic depletion potential, acidification potential, eutrophication potential, ozone depletion potential, and photochemical ozone creation potential. According to the analysis results, five main construction wastes—concrete, rebar, cement, polystyrene panel, and concrete block—comprehensively satisfied the 95% cutoff criteria for all six environmental impact categories. The results of the environmental impact characterization assessment revealed that concrete, concrete block, and cement waste accounted for over 70% of the contribution level in all the environmental impact categories except resource depletion. Insulation materials accounted for 1% of the total waste generated but were identified by the environmental impact assessment to have the highest contribution level.

Topics & Concepts

Life-cycle assessmentGlobal-warming potentialConstruction wasteEnvironmental scienceResource depletionEnvironmental impact assessmentOzone depletionWaste managementRebarImpact assessmentCementGlobal warmingConstruction industryResource (disambiguation)Environmental engineeringEngineeringOzoneClimate changeGreenhouse gasMaterials scienceChemistryProduction (economics)Computer scienceOrganic chemistryEcologyPublic administrationStructural engineeringPolitical scienceBiologyComputer networkMacroeconomicsMetallurgyEconomicsConstruction engineeringRecycled Aggregate Concrete PerformanceSustainable Building Design and AssessmentMunicipal Solid Waste Management
Identifying the Major Construction Wastes in the Building Construction Phase Based on Life Cycle Assessments | Litcius