Organizational and technological parameters during the construction of the Bukhara-Misken railway line

K. S. Lesov, M. K. Kenjaliyev

2022AIP conference proceedings20 citationsDOI

Abstract

The article studies the problem of scientific substantiation of the flow organization of railroad construction. The basic parameters of the flow organization of the production process in relation to their complex coordination in the schedules of the Bukhara-Misken railway line construction are considered. The basic requirements for the organizational and technological models are formulated. The concept of organizing the construction of the Bukhara-Misken railway line taking into account the tight construction schedule, the complexity of desert construction conditions, topography, earthworks, bridges and artificial structures has been developed.

Topics & Concepts

EarthworksScheduleRelation (database)Process (computing)Railway lineProduction (economics)Line (geometry)Computer scienceFlow (mathematics)Civil engineeringEngineeringConstruction engineeringMathematicsGeotechnical engineeringEconomicsMacroeconomicsDatabaseGeometryOperating systemTransport and Logistics InnovationsTransportation Systems and Logistics
Organizational and technological parameters during the construction of the Bukhara-Misken railway line | Litcius