Economic evaluation of operation strategies for battery systems in football stadiums: A Norwegian case study

Kjersti Berg, Matthias Resch, Thaddäus Weniger, Stig Simonsen

2021Journal of Energy Storage26 citationsDOIOpen Access PDF

Abstract

This paper describes a techno-economic evaluation of case studies performed at the Skagerak EnergyLab. The EnergyLab consists of a 1.1 MWh battery energy storage system (BESS) and a 800 kWp photovoltaic (PV) power plant installed in a football stadium. The aim of this paper is to analyse the installation’s performance by studying a variety of cases involving operation strategies for peak shaving, self-consumption maximisation, energy arbitrage and feed-in limitation. The software tool SimSES is used to simulate BESS degradation. Moreover, the Norwegian economic and regulatory framework is used as a basis for an economic evaluation. An important outcome of this work is that a BESS that offers stacked value by combining peak shaving, energy arbitrage, self-consumption and the replacement of a backup diesel generator, may represent a feasible option in Norway. The techno-economic analysis also demonstrates that the profitability is heavily dependent on the operation strategy of the BESS.

Topics & Concepts

Peaking power plantProfitability indexEngineeringNet present valueAutomotive engineeringBackupReliability engineeringRenewable energyProduction (economics)BusinessEconomicsElectrical engineeringFinanceDistributed generationMacroeconomicsMechanical engineeringSmart Grid Energy ManagementElectric Vehicles and InfrastructureElectric Power System Optimization