A two-step scheduling and rescheduling framework for integrated production and usage-based maintenance planning under TOU electricity tariffs: A case study of the tile industry
Asefe Forghani, M. M. Lotfi, Mohammad Ranjbar, Ahmad Sadegheih
Topics & Concepts
UnavailabilityScheduling (production processes)Computer scienceBottleneckEnergy consumptionElectricityIdlePreventive maintenanceReliability engineeringEngineeringOperations managementEmbedded systemElectrical engineeringOperating systemEnergy Efficiency and ManagementScheduling and Optimization AlgorithmsAdvanced Manufacturing and Logistics Optimization