Synchronous-cross zoned excavation of the oversized basement of Shanghai International Financial Centre by combination of bottom-up and top-down methods: Structural and geotechnical behaviors
Yong Tan, Ye Lu, Dalong Wang
Topics & Concepts
BasementExcavationGeotechnical engineeringGeologyEngineeringMining engineeringCivil engineeringGeotechnical Engineering and AnalysisGeotechnical Engineering and Underground StructuresUnderground infrastructure and sustainability