Litcius/Paper detail

Synchronous-cross zoned excavation of the oversized basement of Shanghai International Financial Centre by combination of bottom-up and top-down methods: Structural and geotechnical behaviors

Yong Tan, Ye Lu, Dalong Wang

2024Tunnelling and Underground Space Technology18 citationsDOI

Topics & Concepts

BasementExcavationGeotechnical engineeringGeologyEngineeringMining engineeringCivil engineeringGeotechnical Engineering and AnalysisGeotechnical Engineering and Underground StructuresUnderground infrastructure and sustainability
Synchronous-cross zoned excavation of the oversized basement of Shanghai International Financial Centre by combination of bottom-up and top-down methods: Structural and geotechnical behaviors | Litcius