Litcius/Paper detail

Production scheduling of prefabricated components considering delivery methods

Shuqiang Wang, Xi Zhang

2023Scientific Reports10 citationsDOIOpen Access PDF

Abstract

To address the processing scheduling problem involving multiple molds, components, and floors, we propose the Genetic Grey Wolf Optimizer (GGA) as a means to optimize the production scheduling of components in a production line. This approach combines the Grey Wolf algorithm with the genetic algorithm. Previous methods have overlooked the storage requirements arising from the delivery characteristics of prefabricated components, often resulting in unnecessary storage costs. Intelligent algorithms have been demonstrated to be effective in production scheduling, and thus, to enhance the efficiency of prefabricated component production scheduling, our study presents a model incorporating a production objective function. This model takes into account production resources and delivery characteristics constraints. Subsequently, we develop a hybrid algorithm, combining the grey wolf algorithm with the genetic algorithm, to search for the optimal solution with a minimal storage cost. We validate the model using a case study, and the experimental results demonstrate that GAGWO successfully identifies the best precast production schedule. Furthermore, the precast production plan, considering the delivery method, is found to be reasonable.

Topics & Concepts

Computer scienceScheduling (production processes)Genetic algorithmPrecast concreteGenetic algorithm schedulingScheduleComponent (thermodynamics)Production (economics)Mathematical optimizationDistributed computingFair-share schedulingTwo-level schedulingEngineeringMachine learningMathematicsOperating systemThermodynamicsMacroeconomicsEconomicsCivil engineeringPhysicsScheduling and Optimization AlgorithmsManufacturing Process and OptimizationAdvanced Manufacturing and Logistics Optimization
Production scheduling of prefabricated components considering delivery methods | Litcius