Litcius/Paper detail

Hybrid two stage flowshop scheduling with secondary resources based on time buckets

Alex J. Ruiz‐Torres, Giuseppe Paletta, Belarmino Adenso‐Díaz

2021International Journal of Production Research13 citationsDOI

Abstract

This work studies a two-stage hybrid flowshop problem with secondary resources (workers). The goal is to minimise the average tardiness. The workers are assigned to the workstations by time buckets (work shifts), and the assignment changes during the planning horizon. Two versions of the problem are studied: (i) the case where the average efficiency of the workers determines the time to process jobs; (ii) the case where the efficiency of the slowest worker assigned to a workstation determines the time to process jobs. The problem is NP hard and a set of heuristics are proposed to generate job sequences and worker assignments. Computational experiments are performed on randomly generated test problems. The experiments revealed that the proposed heuristics are able to find a large percentage of the optimal solutions for small sized instances, while on large sized instances the heuristic performance depended on experimental factors.

Topics & Concepts

TardinessHeuristicsScheduling (production processes)WorkstationTime horizonHeuristicMathematical optimizationComputer scienceJob shop schedulingSet (abstract data type)Process (computing)Due dateOperations researchMathematicsScheduleOperating systemProgramming languageScheduling and Optimization AlgorithmsAdvanced Manufacturing and Logistics OptimizationAssembly Line Balancing Optimization
Hybrid two stage flowshop scheduling with secondary resources based on time buckets | Litcius