Commissioning and First Results of the SSRF Phase-II Beamline Project
Renzhong Tai, Zhentang Zhao
Abstract
Abstract The SSRF Phase-II Beamline Project started November 20, 2016 with a 6-year construction period. This project is mainly to construct 18 new beamlines and more than 30 end-stations, as well as the corresponding storage ring upgrades, the user auxiliary laboratories, the beamline technology support laboratories, and the infrastructures. Till now, 11 beamlines have passed the technical acceptance test and been in running. The remaining seven beamlines will be finishing their technical acceptance test soon. The commissioning of the upgraded accelerator is successful including the lattice modification, the new 3rd harmonic superconducting cavity installation and the 650 W helium cryogenic system construction.
Topics & Concepts
BeamlineEngineeringProject commissioningStorage ringSystems engineeringOperating systemNuclear engineeringComputer scienceBeam (structure)Civil engineeringLawPolitical sciencePublishingParticle accelerators and beam dynamicsSuperconducting Materials and ApplicationsParticle Accelerators and Free-Electron Lasers