Litcius/Paper detail

A Bi-Level Bi-Objective optimization model for the integrated storage classes and dual shuttle cranes scheduling in AS/RS with energy consumption, workload balance and time windows

H. Habibi Tostani, H. Haleh, Seyyed Mohammad Hadji Molana, Farzad Movahedi Sobhani

2020Journal of Cleaner Production31 citationsDOI

Topics & Concepts

WorkloadScheduling (production processes)Mathematical optimizationComputer scienceOperations researchEnergy consumptionMinificationJob shop schedulingReal-time computingSimulationEngineeringScheduleMathematicsOperating systemElectrical engineeringAdvanced Manufacturing and Logistics OptimizationOptimization and Packing ProblemsOptimization and Search Problems