Litcius/Paper detail

Integrated generation-transmission expansion planning considering power system reliability and optimal maintenance activities

Meisam Mahdavi, Mohammad Sadegh Javadi, João P. S. Catalào

2022International Journal of Electrical Power & Energy Systems61 citationsDOIOpen Access PDF

Abstract

This paper evaluates lines repair and maintenance impacts on generation-transmission expansion planning (GTEP), considering the transmission and generation reliability. The objective is to form a balance between the transmission and generation expansion and operational costs and reliability, as well as lines repair and maintenance costs. For this purpose, the transmission system reliability is represented by the value of loss of load (LOL) and load shedding owing to line outages, and generation reliability is formulated by the LOL and load shedding indices because of transmission congestion and outage of generating units. The implementation results of the model on the IEEE RTS show that including line repair and maintenance as well as line loading in GTEP leads to optimal generation and transmission plans and significant savings in expansion and operational costs.

Topics & Concepts

Reliability (semiconductor)Reliability engineeringElectric power systemPower transmissionTransmission (telecommunications)Transmission systemComputer scienceEngineeringPower (physics)Electrical engineeringPhysicsQuantum mechanicsPower System Reliability and MaintenanceElectric Power System OptimizationThermal Analysis in Power Transmission
Integrated generation-transmission expansion planning considering power system reliability and optimal maintenance activities | Litcius